Gravel-Shovel Job 4-5th Dec 2004 (3)
Before the bridge was built-The log served as a crossing on another bridge until July 2007 after which it was positioned to deflect flood water away from the footings of a new bridge(Number 2).
© * BLACK DIAMOND IMAGES *