Thank you for your patience while we retrieve your images.
Visitors 4


20 of 21 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Gravel-Shovel Job 4-5th Dec 2004 (1)

Gravel-Shovel Job 4-5th Dec 2004 (1)

Before the bridge was built-The log served as a crossing on another bridge until July 2007 after which it was positioned to deflect flood water away from the footings of a new bridge(Number 2).